Production Scheduling That Makes the Decisions for You

    Keep your ERP. Fix scheduling.

    Skody connects to your ERP, automatically resolves machine, labor, material and priority conflicts, and produces an executable production schedule optimized first for due dates and then for throughput.

    Built for high-mix manufacturers, job shops, aerospace suppliers and other discrete manufacturers where the schedule changes faster than the ERP can keep up.

    • ITAR-Ready
    • Gov Cloud
    • SOC 2
    • Type II
    < 1 Min
    Whole-shop recompute, on demand
    Live
    Real-time production visibility
    Months Early
    Forward-looking delivery risk

    Your ERP may have the data. That does not mean you have a production schedule.

    Orders, routings, time estimates, work centers, material data and labor activity are already in the ERP. Planners still export it into Excel, sequence the jobs by hand, and keep repairing the plan as production changes. That is the gap Skody fills.

    ERP

    • Orders
    • Routings
    • Materials
    • Clock-ins
    • Due dates

    Skody

    • Constraint model
    • Automatic conflict resolution
    • Due-date-first optimization

    Floor

    • What should run
    • On which machine
    • With which person
    • In what sequence
    • To hit which due dates

    β€œERP is the system of record. Skody is the production decision layer.”

    What Skody actually does differently

    Skody makes the scheduling decisions, not just the Gantt chart. The question is not whether an optimizer can build a schedule β€” it is how much work your planner still has to do after it runs.

    Resolve conflicts automatically

    When two jobs need the same machine, operator, skill, tooling, material or pallet, the planner should not have to solve the whole puzzle by hand. Skody evaluates the constraints and produces a feasible production sequence automatically.

    • In: jobs, machines, people, skills
    • In: materials, tooling, pallets, priorities
    • Out: an executable production baseline

    Optimize for the business objective

    Not every feasible schedule is a good schedule. Skody follows one stated hierarchy every time it computes a plan.

    • First: hit customer due dates
    • If that is impossible: minimize lateness
    • Then: improve throughput and productive capacity
    • Always: respect real manufacturing constraints

    Make the schedule usable

    A plan people can operate from β€” planner, floor and management looking at the same sequence.

    • Machine sequence and worker assignments
    • Delivery map, bottleneck view, execution queue
    • Plan A / B / C comparison before you commit

    LIVE FLOOR VIEW

    See the bottleneck, queued work, and delivery impact in one place

    Skody connects a constrained work center to the real jobs queued behind it, the people qualified to run it, and the due dates it puts at risk.

    Bottleneck view β€” Skody AI

    Capability

    Bottleneck by week

    Capability

    Waiting vs running work

    Capability

    Worker-aware schedule

    Capability

    Due date impact

    Not just a schedule β€” a live view of where capacity is breaking down.

    If your best scheduler lives in Excel, you are not alone

    A common Skody customer already has an ERP but still builds or repairs the real production schedule in Excel. The ERP holds the transactions. The planner is still deciding:

    • What goes first
    • What can actually run today
    • Which operator can run it
    • Which jobs are becoming late
    • What happens after a machine or material problem

    Skody automates that decision work.

    See how Skody works with existing ERP data

    From ERP data to an actionable production baseline

    Skody is designed for a short path from ERP data to a usable production baseline. Your ERP stays the system of record throughout.

    01

    Connect

    Read orders, routings, materials, production state and related ERP data.

    02

    Model

    Map real shop constraints such as machines, skills, shifts, pallets, setups and outside processing.

    03

    Compute

    Skody resolves the conflicts and produces the production baseline.

    04

    Execute and recompute

    Use the schedule on the floor. When conditions change, recompute with the same decision logic.

    A machine breaks. An operator calls out. What happens next?

    7:00 AM

    The schedule is good.

    10:00 AM

    • An operation ran long
    • A qualified operator is absent
    • Material is delayed
    • A rush job arrives

    Without Skody

    The planner starts manually rearranging the schedule.

    With Skody

    Update the changed conditions and recompute an optimized baseline.

    The value is not just recalculation. It is that Skody makes the scheduling decisions again using the same business priorities.

    Built for high-mix production

    High-mix is hard for a reason: many active jobs, different routings, short runs, constant setup changes, shared machines, skilled labor, outside operations, due-date pressure and frequent expediting. Every one of those is a constraint Skody schedules against.

    Skody fits CNC job shops, aerospace and defense suppliers, fabrication teams, contract manufacturers, discrete assembly, additive and other mixed-operation plants where labor, routing complexity and outside processing affect delivery.

    CNC machiningFabricationTubing / formingAssemblyMixed operationsContract manufacturing

    Trusted by

    Yeager Manufacturing
    Three Sigma Manufacturing
    Zimmer
    Coastal Manufacturing
    LOC
    CU Vector
    Lafarge + Egge
    Gurecky Manufacturing Service
    GMS Metal Works
    Low Country Machine
    Capterra - 5 stars

    "Scheduling made easy!"

    "Simple and Effective Scheduling Tool"

    Real results from a job shop running Skody AI

    "Skody AI completely changed how we schedule. We extended our planning horizon from one week to a full year β€” without locking ourselves in."
    15%
    reduction in production delays
    days β†’ seconds
    Scheduling time
    1 week β†’ 1 year
    Planning horizon

    Ken Frenkel

    CEO, Three Sigma Manufacturing (Kent, WA)

    Three Sigma Manufacturing shop floor
    "We were stuck under 80% OTD. With Skody AI, we're planning toward 100%. The difference is simple β€” it schedules both machines and people, and the team actually follows the plan."
    <80% β†’ 90%+ OTD
    In 2 months

    Zachary Yeager

    President, Yeager Manufacturing (Winter Park, FL)

    Machines + People Scheduled Β· Plan the Team Actually Follows

    "Scheduling used to be reactive for us. Now we're planning ahead with confidence. Skody gives us real-time visibility into capacity, bottlenecks, and labor β€” and helps us adjust before problems hit the floor."
    <80% β†’ 90%+ OTD
    Planning ahead, not reacting

    Adam Zimmer

    President, Zimmer Manufacturing (Leander, TX)

    Real-Time Visibility Β· Adaptive Scheduling

    Is Skody the right fit?

    Skody is designed so a production manager does not need to become an optimization specialist. It is not the right answer for every shop.

    Good fit

    • You already run an ERP and intend to keep it
    • High-mix production with frequent schedule changes
    • A planner spending hours a day in Excel
    • Labor and operator skills constrain what can run
    • Management cannot reliably see which jobs will be late
    • You need a fast path to an actionable floor schedule

    Less likely fit

    • Simple, repetitive production with little constraint interaction
    • You are primarily shopping for a new ERP
    • You need a broad enterprise MES / MOM replacement
    • Scheduling is already handled well by a whiteboard

    Frequently Asked Questions